Projects  |  Metro Vancouver

Annacis Island WWTP Emergency Power System

WATER AND WASTEWATER

General Contractor
JJM Construction Ltd

Engineering
EIC Solutions Ltd

Location
1299 Derwent Way, Delta B.C.

Capital Value of Project
$TBA

Year of Project
2014

Industry
Water and Wastewater

Overview

This diesel powered generation system was installed at the Annacis Island Wastewater treatment plant in 2015. The installation was comprised of five individual systems and was supplied to operate as emergency standby power for the plant, with automatic start and automatic synchronization to form a single power generation system of 10MW.