Wiring of two 32.5MW Generators, Plant Control System, operation and monitoring of the facility, including the AC and DC power supply system, distribution cabinets and standby diesel generator.
General Contractor
SNC LAVALIN
Engineering
HYDRO-ECI
Location
80 KM N.E of Powell River in Toba Valley
Capital Value of Project
$230,000,000
Year of Project
2015-2016
Industry
Energy and Utilities